Project Details
Nifco KTW is a global supplier of high-quality interior and exterior injection molded components for the automotive industry. Nifco KTW contracted with Evans for the design-build construction of their U.S. Headquarters in Toccoa, Georgia.
The 154,000 sf pre-engineered metal building contains an injection molding bay, assembly/warehouse areas, a high-gloss paint booth, and 10,000 sf of administrative space. The state-of-the-art production area contains two 35-ton bridge cranes and features manufacturing processes including 2-component injection molding, TSG-physical foaming, variotherm, and automatic assembly. Scope of work included design-build services, shell building construction, equipment installation, tenant build-out and a comprehensive site work package.
Client
Nifco KTW
Location
Toccoa, GA
MArket
Manufacturing
Delivery Method
Design-Build