Project Details
Pall Corporation is a single-use technology, filtration, separation and purification leader providing solutions to meet the critical fluid management needs of customers across the broad spectrum of life sciences and industry. Pall works with customers to advance health, safety, and environmentally responsible technologies. The Company’s engineered products enable process and product innovation and minimize emissions and waste.
Evans provided design-build and general contracting services to support the fit-out of 180,000 sf for the manufacturing of single-use and filtrations technologies. The project includes administrative, training, production, and support areas. The production suites are ISO-7 in operation / ISO-5 flexible manufacturing areas with process utilities including compressed air and multi-voltage bus systems to support process equipment. ISO-8 & ISO-7 gowning, kitting, and preparation areas support the production suites. Total ISO classified square footage is 60,000. Based on the mission critical function of the manufacturing and ISO cleanroom requirements the design includes over 10mw of redundant power, critical electrical switchgear, supporting over 2,050 sf of cooling capacity. The project includes over 750,000 sf of ductwork fed from 34 AHUs. The scope of work includes MEP utilities, DI water & process waste, building automation, validated EMS & interlocks, and architectural finishes including modular cleanroom system. Evans is also providing cleanroom certification along with commissioning and qualification services.
* This project is currently under construction.
Client
Pall Corporation
Location
Duncan, SC
MArket
Life Sciences, Advanced Technology
Delivery Method
Design-Build